After
Before
The containment barrier has been completed, and the area is ready to remove the vinyl flooring.
In Progress
Asbestos abatement in progress. We are removing plaster and multiple layers of wallpaper from the walls and ceilings. We needed to remove everything to the stud walls.
Preparing to remove the plaster on both the walls and the ceilings.
The abatement is complete, and we are applying the final coat of lockdown, which will seal any dust particles from becoming airborne.
During abatement – removing the plaster materials from the walls and ceilings.
Abatement in progress – removing plaster on walls. There is an air scrubber on all jobs to vent the air outside to help minimize dust in the air within the work area.
We removed the mastic, which is a type of glue, under vinyl flooring.
Vinyl flooring and mastic needs to be removed. We haven’t started the putting up the containment barrier so that the abatement can begin.
Starting containment barrier. The vinyl flooring and mastic will be removed.
Abatement has been completed. Lockdown has been applied to the floor after the tile flooring was removed.
There is carpet on top of the tile floor that is needing removed. We will remove both flooring materials in the abatement process.
Starting containment before the abatement can proceed. We will put heavy plastic with strong duct tape on all the walls to contain any fibers in the abatement process.